DEPARTMENT OF SUPPORT TO INVESTMENT ACTIVITY AND INVESTMENT PROGRAMS OF THE NATIONAL AGENCY OF UKRAINE FOR RECONSTRUCTION AND DEVELOPMENT
REGISTER of the passports of investment projects
Enterprise, sector, form of ownership Main characteristics of the project General indices of the project
Ministry of Energy of Ukraine Replacement of the exhausted resource of a 100 MWt power-generating unit at the Pridniprovska Thermoelectric Power Plant with a 125 MWt unit with a boiler utilizing environmentally friendly technology, which will use low-quality coal
Ministry of Energy of Ukraine Rehabilitation of the Slaviansk, Myronivka, Lugansk thermoelectric power plants. 125 MWt power-generating units may be installed in these plants equipped with boilers using low-quality coal and slimes (wastes of coal enrichment factories). The cost of three 125 MWt units is: 350 mln USD
Ministry of Energy of Ukraine Construction of two 300 MWt coal power-generating units at the Zuevska Thermoelectric Power Plant The project cost is: 650 mln USD
Ministry of Energy of Ukraine Construction of the Crimean Steam Gas Power Station with two 50 MWt units. The project cost is: 60 mln USD
State-owned enterprise "UkrInterEnergo" Construction of the 2,000 MWt Dnistrovska Hydro-Nuclear Power Plant The project cost: 300 mln USD
State-owned enterprise "UkrInterEnergo" Construction of Unit # 9 at the Dobrotvir Thermoelectric Power Plant The project cost is: 200 mln USD
State-owned enterprise "UkrInterEnergo" Development and modernization of the Odessa Thermoelectric Power Plant The project cost is: 90 mln USD
"Administration of Khmelnytsky N.P.P construction " JSC Designing and manufacturing of block-containers for transportation and preservation of fuel for nuclear power plants
Enterprise "Druzhba" (main oil pipelines). 100% state-owned Connecting oil pipeline "NPK "Pivdenny"- "Western Ukraine" The project cost is: 368.4 mln USD.

The amount of foreign investment needed is: 98.4 mln USD

"UKRANAFTOTERM" CJSC, 85% state-owned Sea oil terminal in the port of Pivdenny (starting-up complex, capacity: 12 mln ton of petroleum per annum) The project cost is: 303.6 mln USD. The amount of foreign investment needed is: 223.6 mln USD
Association "UkrNaftoKhimPererobka" "NAFTOKHIMIK PRYKARPATTYA" JSC, 47.37% state-owned Reconstruction of an oil-processing factory and construction of installations for deep processing of oil (the town of Nadvirna) The project cost is: 191.460 mln USD. The amount of foreign investment needed is: 148 mln USD
Associations "UkrNaftoKhimPererobka" ''NGIK HALYCYNA" JSC, 30.13% state-owned Production of high-octane gasoline The project cost is: 269.843 mln USD. The amount of foreign investment needed is: 118.80 mln USD
State-owned manufacturing enterprise "ChornoMorNaftoGas", 100% state-owned Construction of gas station at the Glibivsky underground depository of gas The project cost is: 35 mln USD. The amount of foreign investment needed is: 30 mln USD
State-owned manufacturing enterprise "ChornoMorNaftoGas", 100% state-owned Construction of an installation for processing of gas and gaseous condense in the town of Chornomorsk The project cost is: 45 mln USD. The amount of foreign investment needed is: 37 mln USD
State-owned manufacturing enterprise "ChornoMorNaftoGas", 100% state-owned Exploitation of the Odessa sea deposit in the Black Sea The project cost is: 157. mln USD. The amount of foreign investment needed is: 130 mln USD
"UKRAGASPROM" JSC, 100% state-owned Reconstruction of "Dolyna" The project cost is: 116.808. The amount of foreign investment needed is: 58.44 mln USD
"UKRAGASPROM" JSC, 100% state-owned Reconstruction of "Lubny" The project cost is: 25.048 mln USD. The amount of foreign investment needed is: 10.019 mln USD
"UKRAGASPROM" JSC, 100% state-owned Exploitation of the Lokachivsky gas deposit The project cost is: 28.83 mln USD. The amount of foreign investment needed is: 23.08 mln USD
"UKRAGASPROM" JSC, 100% state-owned Construction of an automated radio telephone communication system at "UKRGAZPROM" JSC The project cost is: 0.715 mln USD. The amount of foreign investment needed is: 0.643 mln USD
"UKRAGASPROM" JSC, 100% state-owned Construction of an automated radio telephone communication system at "UKRGAZPROM" JSC The project cost is: 12.74 mln USD. The amount of foreign investment needed is: 11.466 mln USD
''UKRNAFTA" JSC, 61% state-owned Refined project of exploitation of the Glinsko-Rozbyshevsky and Chizhivsky oil and condensate deposits The project cost is: 20.06 mln USD. The amount of foreign investment needed is: 16.07 mln USD
''UKRNAFTA" JSC, 61% state-owned Pilot exploitation of the Rudivsko-Chervonozavodsky oil and condensate deposits The project cost is: 105.0 mln USD. The amount of foreign investment needed is: 55.00 mln USD
''UKRNAFTA" JSC, 61% state-owned Equipment of the Kokhanivsky oil and condensate deposits The project cost is: 105.0 mln USD. The amount of foreign investment needed is: 14.85 mln USD
"Constar" factory, 25.1% state-owned Elaboration and organization of the manufacturing of turbine installations The project cost is: 50.96 mln USD. The amount of foreign investment needed is: 25.38 mln USD
"Fastivsky Zavod "Torch" JSC , 30% state-owned Manufacturing of insulated chimneys to be used in gas pipeline construction The project cost is: 7.728 mln USD. The amount of foreign investment needed is: 6.0 mln USD
Dnipropetrovsk Zavod "Temp" Reconstruction of reusable water circuit systems for big power and industrial objects of Ukraine on the basis of up-to-date scientific achievements The project cost is: 0.6 mln USD
''RosUkrNaftoProdukt" Putting power-saving, environmentally friendly technologies into operation at the Zaporizska Thermal Power Plant The project cost is: 18 mln USD, including the need in foreign investments of 12,5 mln USD
Poltava Znamya VO Increase in the output of environmentally friendly electric power resources (solar batteries) for industrial and household use The project cost is: 30 mln USD. The amount of foreign investment needed is: 15 mln USD
"KrymEnergo", Direction of the Crimean heat and power plant construction Extraction and processing of power resources for manufacturing and sale of local gas, electrical and thermal power The project cost is: 35 mln USD. The amount of foreign investment needed is: 22.6 mln USD
State-owned Simpheropol heat and power plant Technical rearmament of the Simferopol Thermal Power Plant with the installation of two 70 MWt highly efficient steam-gas installations The project cost is: 107.218 mln USD. The amount of foreign investment needed is: 52.518 mln USD
"GAZGPROM" JSC Construction of a new main gas pipeline Kherson-Crimea The project cost is: 25.955 mln USD. The amount of foreign investment needed is: 0.382 mln USD
"UkrZakordonNaftoGaz" Corporation Prospecting and extraction of oil and gas The project cost is: 5.62 mln USD. The amount of foreign investment needed is: 5.5 mln USD
"TransOil" CJSC Transshipment of cereal cargoes in the ports of Izmail and Ust-Dunajsk the cost of project 10.5 mln USD. The amount of foreign investment needed is: 10.5 mln USD
"Sewlyush-Syr" OJSC Manufacturing of cheeses, butter and dairy products The amount of foreign investment needed is: 3 mln USD
''Mrapor" CJSC Extraction and processing of marble, manufacturing of marble briquettes and module plates The project cost is: 2104850 USD, need in foreign investments is 100%.
Tarutynsky Rayon Union of Consumer Co-operation Manufacturing of soft drinks The project cost is: 420.7 thousand USD. The need of financing in the form foreign-currency credit is: 157.9 thousand USD
"KharkivDrev" JSC Manufacturing of furniture The volume of investment is: 10 mln USD
"Mekom" JSC Manufacturing of furniture The volume of investment is: 2.789 mln USD
''SPETSMEBLI" JSC Manufacturing of furniture The volume of investment is: 0.85-1.03 mln USD
"SLOVYANSKA MEBLEVA FABRYKA" CJSC Manufacturing of furniture The volume of investment is: 1.2 mln USD
"ZhytomyrDrev" OJSC Manufacturing of furniture The volume of investment is: 5.46 mln USD
"Lybid" Mebleva Firma" JCS Manufacturing of furniture The volume of investment is: 2 mln USD
"KHMELNYKMEBLI" CJSC Manufacturing of furniture The volume of credit is: 2.17 mln USD
"Kyiv Dereveoobrobny Kombinat" Manufacturing of furniture The volume of investment is: 2 mln USD
'' NerudStrojProm" JSC Manufacturing of glazed facade plates, faience, porcelain The volume of investment is: 10 mln USD
"Mohylyansky Zavod Budivelnykh Materialiv" OJSC Manufacturing of facade bricks and ceramic tile The volume of investment is: 10 mln USD
"Prykarpattya" brick manufacturer Manufacturing of facade bricks The volume of investment is: 7.5 mln USD
''Korchevatsky Kombinat Budmaterialiv" JCS Manufacturing of facade ceramic bricks, ceramic gravel, ceramic wall materials The volume of investment is: 10 mln USD
''Khersonska Mebleva Fabryka CJSC Woodworking and manufacture of furniture
''Berezhanski Konservny Zavod" JSC Manufacturing of canned products
''Novomoskovska Mebleva Fabryka" CJSC Manufacturing of furniture The amount of foreign investments needed is: 2.15 mln UAH
"Buran" OJSC Manufacturing of worm rock drill installation âûë-2ä for coal extraction without operator The amount of foreign investments needed is: 2.397 mln USD
Gorlivski Chemical Plan. Nation-wide ownership Reconstruction of mononitroclorobenzenes production The project cost is: 25. mln USD. The amount of foreign investment needed is: 100%
"Druzhkivsky Zavod Gazovoi Aparatury " OJSC Development of manufacturing of household gas balloons meeting European standards The project cost is: 20.181. mln USD. The amount of foreign investments needed is: 16.561 mln USD
"Hera" MPP Creation of an agro-processing complex The project cost is: 6 mln USD. The amount of foreign investment needed is: 100%
"MariupolSeteSnast", state ownership Manufacturing of netting materials for the fishing industry The amount of foreign investments needed is: 3.475 mln USD
"TochMash" OJSC Modernization of the existing and the development of new export-oriented manufacturing of drilling locks for connection of oil chimneys The project cost is: 17.327 mln USD need in investments: 5.25 mln USD
"Akant" CJSC Manufacturing of woodworking products The project cost is: 291 thousand USD. The amount of foreign investment needed is: 260 thousand USD
"Istra" Scientific-industrial Corporation Processing of plumbum breakage and plumbum-containing wastes. Manufacturing of first-quality plumbum and plumbum alloys. The project cost is: 36159085 USD, need in foreign credits: 25.187 mln USD
"YugovostokGaz" CJSC Production of marsh-gas through degazation of the coal deposits of the Chistyakovo-Snizhnyansky mining-geological district The project cost is: 7 mln USD. The amount of foreign investment needed is: 100%
"Prymorje" CJSC Construction of dwelling houses Need in credit: 18.5 mln. Hr.
"Yellow" Manufacturing of bitumen Need in investing: 10 mln USD
"DniproSpetsStal" OJSC Reconstruction of the electric steel-smelting workshop #3 with the installation of machines for ceaseless casting of half-finished goods 400 È 500 mm; 0.100 mm. The project cost is: 33 mln USD. The amount of foreign investment needed is: 100%
"ZaporizhStal" OJSC Reconstruction of the complex of equipment for the workshop #1 for cold rolling The project cost is: 79 mln USD. The amount of foreign investment needed is: 100%
"Illych Mariupol Metallurgic Kombinat" OJSC Reconstruction of oxygen-converting workshop with the installation of two machines for ceaseless casting The project cost is: 90 mln USD. The amount of foreign investment needed is: 75 mln USD
"Illych Mariupol Metallurgic Kombinat" OJSC Completion of the reconstruction of mill 1700 with installation of three coil-winding machines The project cost is: 38.9 mln. USD. The amount of foreign investment needed is: 34.4 mln USD
"Illych Mariupol Metallurgic Kombinat" OJSC Reconstruction oxygen-converting workshop with the installation of the third machines for ceaseless casting The project cost is: 35 mln USD. The amount of foreign investment needed is: 35 mln USD
"KryvorizhStal" state-owned metallurgic works Reconstruction of oxygen-converting workshop #2 with the installation of two machines for ceaseless casting of half-finished products 150 È 150 mm The project cost is: 76 mln USD. The amount of foreign investment needed is: 59 mln USD
"Libknecht Nizhnedniprovsky Truboprokatny Zavod" OJSC Creation of a department for manufacturing of insulated oil chimneys The project cost is: 50 mln USD. The amount of foreign investment needed is: 50 mln USD
"Komintern Dnepropetrovsk Metallurgic Kombinat" OJSC Completion of reconstruction of the zinc-coated chimneys workshop The project cost is: 27.4 mln USD. The amount of foreign investment needed is: 100%
Kryvy Rih Oxidized Ores Processing Integrated Plant Completion of the construction of an integrated plant The project cost is: 686.8 mln USD. The amount of foreign investment needed is: 100%
"Aviant" Kyiv state aircraft factory Organization of the serial manufacturing of airplanes AN-70 The project cost is: 206.6 mln USD. The amount of foreign investment needed is: 108.1 mln. USD.
"Aviant" Kyiv state aircraft factory Organization of the serial manufacturing of AN-32M airplanes The project cost is: 115 mln USD. The amount of foreign investment needed is: 5 mln USD
Vinnytsia aircraft factory Development of the manufacturing of KA-228 helicopters The project cost is: 42 mln USD. The amount of foreign investment needed is: 15 mln USD
Chornomorsky shipyard. State-owned. Technical rearmament and reconstruction of capacities. Development of the manufacturing of new types of many-ton and medium-ton transportation vehicles. The project cost is: 294 mln USD. The amount of foreign investment needed is: 120 mln USD, own funds amount to: 132 mln USD
"61 Communar" Plant. State-owned Completion of the first stage construction of a new shipyard integrated plant The project cost is: 40.2 mln USD. The amount of foreign investment needed is: 24 mln USD, own funds amount to: 12.2 mln USD.
"Leninska Kuznya Zavod" OJSC Development of serial manufacturing of medium refrigerator trawlers 12800 The project cost is: 20.16. mln USD. The amount of foreign investment needed is: 20.16 mln USD
'Motor-Sich " JSC Manufacturing of gas-turbine engines for transportation of natural gas through pipelines and for power plants. The project cost is: 172944637 mln USD. The amount of foreign investment needed is: 60.5446 mln USD
"Zorya" Production Association, State-owned Technical rearmament and creation of production of new 25 MWt and 10 MWt gas turbines The project cost is: 85 mln USD. The amount of foreign investment needed is: 27.6 mln USD, own funds amount to: 43 mln USD
"MashProekt" Scientific-Manufacturing enterprise. State-owned Construction of the first stage of the complex for probation of GTG-110 The project cost is: 5.825 mln USD. The amount of foreign investment needed is: 4.44 mln USD, own funds amount to: 1.385 mln. USD.
"WindEnergo" LLC Manufacturing of licensed L/56-500 wind-turbines pattern The project cost is: 32 mln USD. The amount of foreign investment needed is: 10 mln USD
"EnergoMash-SpetsStal" OJSC Organization of the serial manufacturing of large-diameter chimneys for nuclear and thermal power plants. Phase 1: Organization of serial manufacturing of half-finished chimneys on the basis of automated forging complex of the 2,500 ton-power press The project cost is: 38.223 mln USD. The amount of foreign investment needed is: 13.823 mln USD, own funds: 24.5 mln USD
"Zove" associated company "Vinnytsia Lamp Factory ''OJSC Organization of the manufacturing of power-saving lamps The project cost is: 2.6 mln USD, need in foreign investments - 100%
"ElectronMash" production association. State-owned Elaboration and putting into operation of the automated system for measurement of power used in public utilities. The project cost is: 5 mln USD, need in foreign investments - 100%
"Selmi" OJSC Technical and methodological provision of certification of motor fuel in Ukraine on the basis of chromatographs manufactured by "Celmi" OJSC '' ( Sumy) The project cost is: 1 mln USD, need in foreign investments - 100%
"Pivdenny Mashinobudivny Zavod. State-owned Creation of a joint venture engaged in the manufacturing of tractors and trailer equipment for them The project cost is: 594.63 mln USD, need in foreign investments - 100%
"Ordjonikidze Kharkiv Tractor Factory" OJSC Organization of the manufacturing of agrarian tractors èôú-17021 with ÷òí 1013å engines manufactured by German "Deutsche Far" The project cost is: 9.5 mln USD. The amount of foreign investment needed is: 8.1 mln USD
"Kherson Combines" OJSC Creation of the manufacturing of home-produced combine harvesters "Slavutich", as per the Cabinet of Ministers Decree #538 of 17 May 1996 The project cost is: 88 mln USD. The amount of foreign investment needed is: 48 mln USD
"OdesSilMash" OJSC Creation of a Ukrainian-Austrian joint venture engaged in the manufacturing of reverse plows The project cost is: 15.8. mln USD. The amount of foreign investment needed is: 15.8 mln USD
"Chervona Zirka" OJSC Creation of the manufacture of plastic transportation packages for a broad assortment of goods The project cost is: 23.5 mln USD. The need in foreign investments-100%
"Etal" OJSC Organization of the serial manufacturing of machines for automatic pre-packaging and packaging of fluid and viscous nutritious products The project cost is: 10.221 mln USD. The amount of foreign investment needed is: 2.556 mln USD
"LuhanskTeploVoz". State-owned enterprise Creation and development of manufacture of electric trains The project cost is: 78.3 mln USD. The amount of foreign investment needed is: 30 mln USD, own funds amount to: 13 mln USD
"Kryukivsky Vahonobudivny Zavod" JSC Organization of manufacture of passenger cars in Ukraine The project cost is: 45 mln USD. The amount of foreign investment needed is: 22.8 mln USD, own funds amount to: 12.2 mln USD
"Dnipropetrovsk Eletrovozobudivny Zavod" Scientific-Production Association. State-owned Organization of manufacture of electric locomotives The project cost is: 91.35 mln USD. The amount of foreign investment needed is: 32 mln USD, own funds amount to: 21.35 mln USD
"AvtoKRAz", subsidiary of "Automotive Manufacturing", 77.33% state-owned; 22.67% owned by shareholders Creation of new models of cargo motor-cars with carrying capacity ranging between 8 and 18 tons The project cost is: 58 mln USD, need in foreign investments-100%
"Lvivsky Avtobusny Zavod" OJSC Creation of the manufacturing of new models of diesel buses and trolley-buses The project cost is: 75.1. mln USD. The amount of foreign investment needed is: 49.925 mln USD
"Kvartz" OJSC Organization of the serial manufacture of automotive spark plugs The project cost is: 4.929. mln USD. The amount of foreign investment needed is: 2.323 mln USD, own funds: 2.2 mln USD
"Orion" production association, State-owned Elaboration and organization of the manufacturing systems for official trunking radio communication The project cost is: 4.5. mln USD. The amount of foreign investment needed is: 4.5 mln USD
Sevastopol design bureau of radio communication, State-owned Development of the serial production of "Hardware for global sea communication and rescue on the sea" The project cost is: 1.2 mln USD. The amount of foreign investment needed is: 1.2 mln USD
"Rosava" OJSC Restructuring of the factory with equipment for manufacture and extension of the assortment of competitive products (tires) The project cost is: 80.7 mln USD. The amount of foreign investment needed is: 80.7 mln USD
"DniproAzot" OJSC Reconstruction of ammonia manufacturing using AM-76 aggregate The project cost is: 30 mln USD. The amount of foreign investment needed is: 30 mln USD
Crimean "Titan" production association. State-owned Reconstruction of the department for white filtration at the titanium dioxide workshop The project cost is: 10 mln USD. The amount of foreign investment needed is: 10 mln USD
Severodonetsk "Azot" production association. State-owned Reconstruction of ammonium manufacturing for production of ammonium and methanol The project cost is: 25 mln USD. The amount of foreign investment needed is: 25 mln USD
"Rubin" state-owned enterprise of the vacuum metallurgy of constructional materials (subsidiary of "UkrBudMaterialy" state incorporated company) Creation of the manufacture of catalyst nets from the alloys of metals from the platinum group The project cost is: 5 mln USD. The amount of foreign investment needed is: 5 mln USD
"Nitrogen" OJSC Putting into operation of a technology manufacturing carbamide packed into sacks or big-bags The project cost is: 940 thousand USD. The amount of foreign investment needed is: 640 thousand USD
"Nitrogen" OJSC Creation of a new ammonium production with the capacity of 610 thousand ton per annum applying a power-saving technology The project cost is: 210 mln USD. The amount of foreign investment needed is: 210 mln USD
"SumyKhimProm" OJSC Construction of the workshop for manufacturing of sulfuric acid applying an up-to-date technology The project cost is: 40 mln USD, need in investments: 40 mln USD.
"SumyKhimProm" OJSC Reconstruction of dioxide titanium production The project cost is: 10 mln USD, need in investments: 10 mln USD
"RivneAzot" OJSC Creation of a new ammonium production with the capacity of 610 thousand ton per annum applying a power-saving technology The project cost is: 210 mln USD. The amount of foreign investment needed is: 210 mln USD
Rozdillya "Sirka" state-owned enterprise Construction of a 200,000 ton/year installation for manufacturing of calcium-ammonium nitrate The project cost is: 6 mln USD. The amount of foreign investment needed is: 6 mln USD
"Artem" state joint-stock holding company Development of the manufacture of machinery for the handicapped The project cost is: 21.8 mln USD. The amount of foreign investment needed is: 15 mln USD, own funds: 6.8 mln USD