| DEPARTMENT OF SUPPORT TO INVESTMENT ACTIVITY AND INVESTMENT PROGRAMS OF THE NATIONAL AGENCY OF UKRAINE FOR RECONSTRUCTION AND DEVELOPMENT | ||
| REGISTER of the passports of investment projects | ||
| Enterprise, sector, form of ownership | Main characteristics of the project | General indices of the project |
| Ministry of Energy of Ukraine | Replacement of the exhausted resource of a 100 MWt power-generating unit at the Pridniprovska Thermoelectric Power Plant with a 125 MWt unit with a boiler utilizing environmentally friendly technology, which will use low-quality coal | |
| Ministry of Energy of Ukraine | Rehabilitation of the Slaviansk, Myronivka, Lugansk thermoelectric power plants. 125 MWt power-generating units may be installed in these plants equipped with boilers using low-quality coal and slimes (wastes of coal enrichment factories). | The cost of three 125 MWt units is: 350 mln USD |
| Ministry of Energy of Ukraine | Construction of two 300 MWt coal power-generating units at the Zuevska Thermoelectric Power Plant | The project cost is: 650 mln USD |
| Ministry of Energy of Ukraine | Construction of the Crimean Steam Gas Power Station with two 50 MWt units. | The project cost is: 60 mln USD |
| State-owned enterprise "UkrInterEnergo" | Construction of the 2,000 MWt Dnistrovska Hydro-Nuclear Power Plant | The project cost: 300 mln USD |
| State-owned enterprise "UkrInterEnergo" | Construction of Unit # 9 at the Dobrotvir Thermoelectric Power Plant | The project cost is: 200 mln USD |
| State-owned enterprise "UkrInterEnergo" | Development and modernization of the Odessa Thermoelectric Power Plant | The project cost is: 90 mln USD |
| "Administration of Khmelnytsky N.P.P construction " JSC | Designing and manufacturing of block-containers for transportation and preservation of fuel for nuclear power plants | |
| Enterprise "Druzhba" (main oil pipelines). 100% state-owned | Connecting oil pipeline "NPK "Pivdenny"- "Western Ukraine" | The project cost is: 368.4 mln USD.
The amount of foreign investment needed is: 98.4 mln USD |
| "UKRANAFTOTERM" CJSC, 85% state-owned | Sea oil terminal in the port of Pivdenny (starting-up complex, capacity: 12 mln ton of petroleum per annum) | The project cost is: 303.6 mln USD. The amount of foreign investment needed is: 223.6 mln USD |
| Association "UkrNaftoKhimPererobka" "NAFTOKHIMIK PRYKARPATTYA" JSC, 47.37% state-owned | Reconstruction of an oil-processing factory and construction of installations for deep processing of oil (the town of Nadvirna) | The project cost is: 191.460 mln USD. The amount of foreign investment needed is: 148 mln USD |
| Associations "UkrNaftoKhimPererobka" ''NGIK HALYCYNA" JSC, 30.13% state-owned | Production of high-octane gasoline | The project cost is: 269.843 mln USD. The amount of foreign investment needed is: 118.80 mln USD |
| State-owned manufacturing enterprise "ChornoMorNaftoGas", 100% state-owned | Construction of gas station at the Glibivsky underground depository of gas | The project cost is: 35 mln USD. The amount of foreign investment needed is: 30 mln USD |
| State-owned manufacturing enterprise "ChornoMorNaftoGas", 100% state-owned | Construction of an installation for processing of gas and gaseous condense in the town of Chornomorsk | The project cost is: 45 mln USD. The amount of foreign investment needed is: 37 mln USD |
| State-owned manufacturing enterprise "ChornoMorNaftoGas", 100% state-owned | Exploitation of the Odessa sea deposit in the Black Sea | The project cost is: 157. mln USD. The amount of foreign investment needed is: 130 mln USD |
| "UKRAGASPROM" JSC, 100% state-owned | Reconstruction of "Dolyna" | The project cost is: 116.808. The amount of foreign investment needed is: 58.44 mln USD |
| "UKRAGASPROM" JSC, 100% state-owned | Reconstruction of "Lubny" | The project cost is: 25.048 mln USD. The amount of foreign investment needed is: 10.019 mln USD |
| "UKRAGASPROM" JSC, 100% state-owned | Exploitation of the Lokachivsky gas deposit | The project cost is: 28.83 mln USD. The amount of foreign investment needed is: 23.08 mln USD |
| "UKRAGASPROM" JSC, 100% state-owned | Construction of an automated radio telephone communication system at "UKRGAZPROM" JSC | The project cost is: 0.715 mln USD. The amount of foreign investment needed is: 0.643 mln USD |
| "UKRAGASPROM" JSC, 100% state-owned | Construction of an automated radio telephone communication system at "UKRGAZPROM" JSC | The project cost is: 12.74 mln USD. The amount of foreign investment needed is: 11.466 mln USD |
| ''UKRNAFTA" JSC, 61% state-owned | Refined project of exploitation of the Glinsko-Rozbyshevsky and Chizhivsky oil and condensate deposits | The project cost is: 20.06 mln USD. The amount of foreign investment needed is: 16.07 mln USD |
| ''UKRNAFTA" JSC, 61% state-owned | Pilot exploitation of the Rudivsko-Chervonozavodsky oil and condensate deposits | The project cost is: 105.0 mln USD. The amount of foreign investment needed is: 55.00 mln USD |
| ''UKRNAFTA" JSC, 61% state-owned | Equipment of the Kokhanivsky oil and condensate deposits | The project cost is: 105.0 mln USD. The amount of foreign investment needed is: 14.85 mln USD |
| "Constar" factory, 25.1% state-owned | Elaboration and organization of the manufacturing of turbine installations | The project cost is: 50.96 mln USD. The amount of foreign investment needed is: 25.38 mln USD |
| "Fastivsky Zavod "Torch" JSC , 30% state-owned | Manufacturing of insulated chimneys to be used in gas pipeline construction | The project cost is: 7.728 mln USD. The amount of foreign investment needed is: 6.0 mln USD |
| Dnipropetrovsk Zavod "Temp" | Reconstruction of reusable water circuit systems for big power and industrial objects of Ukraine on the basis of up-to-date scientific achievements | The project cost is: 0.6 mln USD |
| ''RosUkrNaftoProdukt" | Putting power-saving, environmentally friendly technologies into operation at the Zaporizska Thermal Power Plant | The project cost is: 18 mln USD, including the need in foreign investments of 12,5 mln USD |
| Poltava Znamya VO | Increase in the output of environmentally friendly electric power resources (solar batteries) for industrial and household use | The project cost is: 30 mln USD. The amount of foreign investment needed is: 15 mln USD |
| "KrymEnergo", Direction of the Crimean heat and power plant construction | Extraction and processing of power resources for manufacturing and sale of local gas, electrical and thermal power | The project cost is: 35 mln USD. The amount of foreign investment needed is: 22.6 mln USD |
| State-owned Simpheropol heat and power plant | Technical rearmament of the Simferopol Thermal Power Plant with the installation of two 70 MWt highly efficient steam-gas installations | The project cost is: 107.218 mln USD. The amount of foreign investment needed is: 52.518 mln USD |
| "GAZGPROM" JSC | Construction of a new main gas pipeline Kherson-Crimea | The project cost is: 25.955 mln USD. The amount of foreign investment needed is: 0.382 mln USD |
| "UkrZakordonNaftoGaz" Corporation | Prospecting and extraction of oil and gas | The project cost is: 5.62 mln USD. The amount of foreign investment needed is: 5.5 mln USD |
| "TransOil" CJSC | Transshipment of cereal cargoes in the ports of Izmail and Ust-Dunajsk | the cost of project 10.5 mln USD. The amount of foreign investment needed is: 10.5 mln USD |
| "Sewlyush-Syr" OJSC | Manufacturing of cheeses, butter and dairy products | The amount of foreign investment needed is: 3 mln USD |
| ''Mrapor" CJSC | Extraction and processing of marble, manufacturing of marble briquettes and module plates | The project cost is: 2104850 USD, need in foreign investments is 100%. |
| Tarutynsky Rayon Union of Consumer Co-operation | Manufacturing of soft drinks | The project cost is: 420.7 thousand USD. The need of financing in the form foreign-currency credit is: 157.9 thousand USD |
| "KharkivDrev" JSC | Manufacturing of furniture | The volume of investment is: 10 mln USD |
| "Mekom" JSC | Manufacturing of furniture | The volume of investment is: 2.789 mln USD |
| ''SPETSMEBLI" JSC | Manufacturing of furniture | The volume of investment is: 0.85-1.03 mln USD |
| "SLOVYANSKA MEBLEVA FABRYKA" CJSC | Manufacturing of furniture | The volume of investment is: 1.2 mln USD |
| "ZhytomyrDrev" OJSC | Manufacturing of furniture | The volume of investment is: 5.46 mln USD |
| "Lybid" Mebleva Firma" JCS | Manufacturing of furniture | The volume of investment is: 2 mln USD |
| "KHMELNYKMEBLI" CJSC | Manufacturing of furniture | The volume of credit is: 2.17 mln USD |
| "Kyiv Dereveoobrobny Kombinat" | Manufacturing of furniture | The volume of investment is: 2 mln USD |
| '' NerudStrojProm" JSC | Manufacturing of glazed facade plates, faience, porcelain | The volume of investment is: 10 mln USD |
| "Mohylyansky Zavod Budivelnykh Materialiv" OJSC | Manufacturing of facade bricks and ceramic tile | The volume of investment is: 10 mln USD |
| "Prykarpattya" brick manufacturer | Manufacturing of facade bricks | The volume of investment is: 7.5 mln USD |
| ''Korchevatsky Kombinat Budmaterialiv" JCS | Manufacturing of facade ceramic bricks, ceramic gravel, ceramic wall materials | The volume of investment is: 10 mln USD |
| ''Khersonska Mebleva Fabryka CJSC | Woodworking and manufacture of furniture | |
| ''Berezhanski Konservny Zavod" JSC | Manufacturing of canned products | |
| ''Novomoskovska Mebleva Fabryka" CJSC | Manufacturing of furniture | The amount of foreign investments needed is: 2.15 mln UAH |
| "Buran" OJSC | Manufacturing of worm rock drill installation âûë-2ä for coal extraction without operator | The amount of foreign investments needed is: 2.397 mln USD |
| Gorlivski Chemical Plan. Nation-wide ownership | Reconstruction of mononitroclorobenzenes production | The project cost is: 25. mln USD. The amount of foreign investment needed is: 100% |
| "Druzhkivsky Zavod Gazovoi Aparatury " OJSC | Development of manufacturing of household gas balloons meeting European standards | The project cost is: 20.181. mln USD. The amount of foreign investments needed is: 16.561 mln USD |
| "Hera" MPP | Creation of an agro-processing complex | The project cost is: 6 mln USD. The amount of foreign investment needed is: 100% |
| "MariupolSeteSnast", state ownership | Manufacturing of netting materials for the fishing industry | The amount of foreign investments needed is: 3.475 mln USD |
| "TochMash" OJSC | Modernization of the existing and the development of new export-oriented manufacturing of drilling locks for connection of oil chimneys | The project cost is: 17.327 mln USD need in investments: 5.25 mln USD |
| "Akant" CJSC | Manufacturing of woodworking products | The project cost is: 291 thousand USD. The amount of foreign investment needed is: 260 thousand USD |
| "Istra" Scientific-industrial Corporation | Processing of plumbum breakage and plumbum-containing wastes. Manufacturing of first-quality plumbum and plumbum alloys. | The project cost is: 36159085 USD, need in foreign credits: 25.187 mln USD |
| "YugovostokGaz" CJSC | Production of marsh-gas through degazation of the coal deposits of the Chistyakovo-Snizhnyansky mining-geological district | The project cost is: 7 mln USD. The amount of foreign investment needed is: 100% |
| "Prymorje" CJSC | Construction of dwelling houses | Need in credit: 18.5 mln. Hr. |
| "Yellow" | Manufacturing of bitumen | Need in investing: 10 mln USD |
| "DniproSpetsStal" OJSC | Reconstruction of the electric steel-smelting workshop #3 with the installation of machines for ceaseless casting of half-finished goods 400 È 500 mm; 0.100 mm. | The project cost is: 33 mln USD. The amount of foreign investment needed is: 100% |
| "ZaporizhStal" OJSC | Reconstruction of the complex of equipment for the workshop #1 for cold rolling | The project cost is: 79 mln USD. The amount of foreign investment needed is: 100% |
| "Illych Mariupol Metallurgic Kombinat" OJSC | Reconstruction of oxygen-converting workshop with the installation of two machines for ceaseless casting | The project cost is: 90 mln USD. The amount of foreign investment needed is: 75 mln USD |
| "Illych Mariupol Metallurgic Kombinat" OJSC | Completion of the reconstruction of mill 1700 with installation of three coil-winding machines | The project cost is: 38.9 mln. USD. The amount of foreign investment needed is: 34.4 mln USD |
| "Illych Mariupol Metallurgic Kombinat" OJSC | Reconstruction oxygen-converting workshop with the installation of the third machines for ceaseless casting | The project cost is: 35 mln USD. The amount of foreign investment needed is: 35 mln USD |
| "KryvorizhStal" state-owned metallurgic works | Reconstruction of oxygen-converting workshop #2 with the installation of two machines for ceaseless casting of half-finished products 150 È 150 mm | The project cost is: 76 mln USD. The amount of foreign investment needed is: 59 mln USD |
| "Libknecht Nizhnedniprovsky Truboprokatny Zavod" OJSC | Creation of a department for manufacturing of insulated oil chimneys | The project cost is: 50 mln USD. The amount of foreign investment needed is: 50 mln USD |
| "Komintern Dnepropetrovsk Metallurgic Kombinat" OJSC | Completion of reconstruction of the zinc-coated chimneys workshop | The project cost is: 27.4 mln USD. The amount of foreign investment needed is: 100% |
| Kryvy Rih Oxidized Ores Processing Integrated Plant | Completion of the construction of an integrated plant | The project cost is: 686.8 mln USD. The amount of foreign investment needed is: 100% |
| "Aviant" Kyiv state aircraft factory | Organization of the serial manufacturing of airplanes AN-70 | The project cost is: 206.6 mln USD. The amount of foreign investment needed is: 108.1 mln. USD. |
| "Aviant" Kyiv state aircraft factory | Organization of the serial manufacturing of AN-32M airplanes | The project cost is: 115 mln USD. The amount of foreign investment needed is: 5 mln USD |
| Vinnytsia aircraft factory | Development of the manufacturing of KA-228 helicopters | The project cost is: 42 mln USD. The amount of foreign investment needed is: 15 mln USD |
| Chornomorsky shipyard. State-owned. | Technical rearmament and reconstruction of capacities. Development of the manufacturing of new types of many-ton and medium-ton transportation vehicles. | The project cost is: 294 mln USD. The amount of foreign investment needed is: 120 mln USD, own funds amount to: 132 mln USD |
| "61 Communar" Plant. State-owned | Completion of the first stage construction of a new shipyard integrated plant | The project cost is: 40.2 mln USD. The amount of foreign investment needed is: 24 mln USD, own funds amount to: 12.2 mln USD. |
| "Leninska Kuznya Zavod" OJSC | Development of serial manufacturing of medium refrigerator trawlers 12800 | The project cost is: 20.16. mln USD. The amount of foreign investment needed is: 20.16 mln USD |
| 'Motor-Sich " JSC | Manufacturing of gas-turbine engines for transportation of natural gas through pipelines and for power plants. | The project cost is: 172944637 mln USD. The amount of foreign investment needed is: 60.5446 mln USD |
| "Zorya" Production Association, State-owned | Technical rearmament and creation of production of new 25 MWt and 10 MWt gas turbines | The project cost is: 85 mln USD. The amount of foreign investment needed is: 27.6 mln USD, own funds amount to: 43 mln USD |
| "MashProekt" Scientific-Manufacturing enterprise. State-owned | Construction of the first stage of the complex for probation of GTG-110 | The project cost is: 5.825 mln USD. The amount of foreign investment needed is: 4.44 mln USD, own funds amount to: 1.385 mln. USD. |
| "WindEnergo" LLC | Manufacturing of licensed L/56-500 wind-turbines pattern | The project cost is: 32 mln USD. The amount of foreign investment needed is: 10 mln USD |
| "EnergoMash-SpetsStal" OJSC | Organization of the serial manufacturing of large-diameter chimneys for nuclear and thermal power plants. Phase 1: Organization of serial manufacturing of half-finished chimneys on the basis of automated forging complex of the 2,500 ton-power press | The project cost is: 38.223 mln USD. The amount of foreign investment needed is: 13.823 mln USD, own funds: 24.5 mln USD |
| "Zove" associated company "Vinnytsia Lamp Factory ''OJSC | Organization of the manufacturing of power-saving lamps | The project cost is: 2.6 mln USD, need in foreign investments - 100% |
| "ElectronMash" production association. State-owned | Elaboration and putting into operation of the automated system for measurement of power used in public utilities. | The project cost is: 5 mln USD, need in foreign investments - 100% |
| "Selmi" OJSC | Technical and methodological provision of certification of motor fuel in Ukraine on the basis of chromatographs manufactured by "Celmi" OJSC '' ( Sumy) | The project cost is: 1 mln USD, need in foreign investments - 100% |
| "Pivdenny Mashinobudivny Zavod. State-owned | Creation of a joint venture engaged in the manufacturing of tractors and trailer equipment for them | The project cost is: 594.63 mln USD, need in foreign investments - 100% |
| "Ordjonikidze Kharkiv Tractor Factory" OJSC | Organization of the manufacturing of agrarian tractors èôú-17021 with ÷òí 1013å engines manufactured by German "Deutsche Far" | The project cost is: 9.5 mln USD. The amount of foreign investment needed is: 8.1 mln USD |
| "Kherson Combines" OJSC | Creation of the manufacturing of home-produced combine harvesters "Slavutich", as per the Cabinet of Ministers Decree #538 of 17 May 1996 | The project cost is: 88 mln USD. The amount of foreign investment needed is: 48 mln USD |
| "OdesSilMash" OJSC | Creation of a Ukrainian-Austrian joint venture engaged in the manufacturing of reverse plows | The project cost is: 15.8. mln USD. The amount of foreign investment needed is: 15.8 mln USD |
| "Chervona Zirka" OJSC | Creation of the manufacture of plastic transportation packages for a broad assortment of goods | The project cost is: 23.5 mln USD. The need in foreign investments-100% |
| "Etal" OJSC | Organization of the serial manufacturing of machines for automatic pre-packaging and packaging of fluid and viscous nutritious products | The project cost is: 10.221 mln USD. The amount of foreign investment needed is: 2.556 mln USD |
| "LuhanskTeploVoz". State-owned enterprise | Creation and development of manufacture of electric trains | The project cost is: 78.3 mln USD. The amount of foreign investment needed is: 30 mln USD, own funds amount to: 13 mln USD |
| "Kryukivsky Vahonobudivny Zavod" JSC | Organization of manufacture of passenger cars in Ukraine | The project cost is: 45 mln USD. The amount of foreign investment needed is: 22.8 mln USD, own funds amount to: 12.2 mln USD |
| "Dnipropetrovsk Eletrovozobudivny Zavod" Scientific-Production Association. State-owned | Organization of manufacture of electric locomotives | The project cost is: 91.35 mln USD. The amount of foreign investment needed is: 32 mln USD, own funds amount to: 21.35 mln USD |
| "AvtoKRAz", subsidiary of "Automotive Manufacturing", 77.33% state-owned; 22.67% owned by shareholders | Creation of new models of cargo motor-cars with carrying capacity ranging between 8 and 18 tons | The project cost is: 58 mln USD, need in foreign investments-100% |
| "Lvivsky Avtobusny Zavod" OJSC | Creation of the manufacturing of new models of diesel buses and trolley-buses | The project cost is: 75.1. mln USD. The amount of foreign investment needed is: 49.925 mln USD |
| "Kvartz" OJSC | Organization of the serial manufacture of automotive spark plugs | The project cost is: 4.929. mln USD. The amount of foreign investment needed is: 2.323 mln USD, own funds: 2.2 mln USD |
| "Orion" production association, State-owned | Elaboration and organization of the manufacturing systems for official trunking radio communication | The project cost is: 4.5. mln USD. The amount of foreign investment needed is: 4.5 mln USD |
| Sevastopol design bureau of radio communication, State-owned | Development of the serial production of "Hardware for global sea communication and rescue on the sea" | The project cost is: 1.2 mln USD. The amount of foreign investment needed is: 1.2 mln USD |
| "Rosava" OJSC | Restructuring of the factory with equipment for manufacture and extension of the assortment of competitive products (tires) | The project cost is: 80.7 mln USD. The amount of foreign investment needed is: 80.7 mln USD |
| "DniproAzot" OJSC | Reconstruction of ammonia manufacturing using AM-76 aggregate | The project cost is: 30 mln USD. The amount of foreign investment needed is: 30 mln USD |
| Crimean "Titan" production association. State-owned | Reconstruction of the department for white filtration at the titanium dioxide workshop | The project cost is: 10 mln USD. The amount of foreign investment needed is: 10 mln USD |
| Severodonetsk "Azot" production association. State-owned | Reconstruction of ammonium manufacturing for production of ammonium and methanol | The project cost is: 25 mln USD. The amount of foreign investment needed is: 25 mln USD |
| "Rubin" state-owned enterprise of the vacuum metallurgy of constructional materials (subsidiary of "UkrBudMaterialy" state incorporated company) | Creation of the manufacture of catalyst nets from the alloys of metals from the platinum group | The project cost is: 5 mln USD. The amount of foreign investment needed is: 5 mln USD |
| "Nitrogen" OJSC | Putting into operation of a technology manufacturing carbamide packed into sacks or big-bags | The project cost is: 940 thousand USD. The amount of foreign investment needed is: 640 thousand USD |
| "Nitrogen" OJSC | Creation of a new ammonium production with the capacity of 610 thousand ton per annum applying a power-saving technology | The project cost is: 210 mln USD. The amount of foreign investment needed is: 210 mln USD |
| "SumyKhimProm" OJSC | Construction of the workshop for manufacturing of sulfuric acid applying an up-to-date technology | The project cost is: 40 mln USD, need in investments: 40 mln USD. |
| "SumyKhimProm" OJSC | Reconstruction of dioxide titanium production | The project cost is: 10 mln USD, need in investments: 10 mln USD |
| "RivneAzot" OJSC | Creation of a new ammonium production with the capacity of 610 thousand ton per annum applying a power-saving technology | The project cost is: 210 mln USD. The amount of foreign investment needed is: 210 mln USD |
| Rozdillya "Sirka" state-owned enterprise | Construction of a 200,000 ton/year installation for manufacturing of calcium-ammonium nitrate | The project cost is: 6 mln USD. The amount of foreign investment needed is: 6 mln USD |
| "Artem" state joint-stock holding company | Development of the manufacture of machinery for the handicapped | The project cost is: 21.8 mln USD. The amount of foreign investment needed is: 15 mln USD, own funds: 6.8 mln USD |